The water electrolysis plant will be built in Varennes, Quebec, and is to produce 11,100 metric tons of green hydrogen annually. Both the hydrogen and the oxygen, a by-product of the electrolysis process, will be used in a biofuel plant to produce biofuels from residual waste for the transportation sector.
With a capacity of 88 MW, this plant will be one of the world's first and biggest production facilities for green hydrogen. Commissioning is scheduled for late 2023.
Article Publish Date